The Claire-McNicoll Pavilion was built in 1965 as a block of classrooms serving the entire campus. The purpose of the renovation project was to implement a functional program that would conform to the contemporary specifications of the teaching spaces and auditoriums, ensuring improved acoustic performance and indoor air quality, as well as the optimization and standardization of the utilitarian spaces.
The work consisted of the interior refitting and complete overhaul of the building's mechanical systems. The work had to be carried out within the sixteen weeks of academic inactivity between the winter and fall terms.
Campus-specific urban planning regulations and complex authorization processes imposed severe constraints on the design and were integrated into the project schedule.
Start the slideshow